The reconstruction of Ann Arbor-Saline Road between Lohr Road and Eisenhower Parkway is scheduled to move into Stage 3 by early next week, weather permitting.  During Stage 3 one lane in each direction between Oak Valley Drive and I-94 will re-open.  All lanes are planned to be opened to traffic north of I-94.  All freeway entrance and exit ramps will be open.  However, Lohr Road will be closed at the Ann Arbor-Saline Road intersection and a detour will be signed.  Stage 3 will likely be completed in late September or early October depending on weather.

Skip to content