Depot Street traffic delays for street resurfacing and repairs

Beginning on Monday, May 9 and anticipated to last until Saturday, June 11, Depot Street between North Main Street and Carey Street will be resurfaced and sidewalks and curbs will be repaired.  Throughout the construction period two-way traffic will generally be maintained in shifted lanes, however drivers should anticipate intermittent delays.  Pedestrian traffic will be maintained with detours as needed.

Skip to content