On Tuesday, October 11, between 9:00 AM and 3:30 PM, one lane in each direction will be closed on the Fuller Road bridge over the Huron River to allow the city to conduct bridge inspections.  Initially,  the outside lane in each direction will be closed, while the inside lanes in each direction are maintained.  Then, the inside lanes will be closed while the outside lanes are reopened.  Pedestrian traffic will be maintained.

Then, on Wednesday, October 12, between 9:00 AM and 3:30 PM, one lane in each direction will be closed on the Maiden Lane bridge over the Huron River to allow the city to conduct bridge inspections.  Initially, the outside lanes in each direction will be closed, while the inside lanes in each direction are maintained.  Then, the inside lanes will be closed while the outside lanes are reopened.  Pedestrian traffic will be maintained.

Skip to content