Beginning Friday evening, March 4 and lasting through August, M-14 between Miller Road (Exit 2) and US-23 Business Route (Main Street / Exit 3) will be closed for concrete and bridge repairs.  The posted detour route for through traffic will include US-23 and I-94.
One lane will be open in each direction on M-14 between I-94 and Miller Road (Exit 2) for local traffic, and the Miller Road/Maple Road interchange will remain open during construction.  One lane will also be open in each direction on M-14 between US-23 BR (Main Street) and the US-23/M-14 interchange for local traffic.
The Barton Drive ramp to eastbound M-14 will remain open during construction; the eastbound M-14 ramp to Barton Drive will be closed intermittently.  The westbound M-14 ramp to Barton Drive will remain open during construction; the Barton Drive ramp to westbound M-14 will be closed.
For more information please see the attached project flyer and map or visit MDOT’s news and information page at http://www.michigan.gov/m14close.
Skip to content