Beginning Monday, September 18 and anticipated to last until Monday, September 25, weather permitting, West Stadium Boulevard between 7th Street and Main Street will be reduced to one lane in each direction to perform drainage repairs and street resurfacing.  Pedestrian traffic will be maintained or detoured as required.

Skip to content