The project includes renovation of the entire approximately 67,000-gross square-foot building, including renovated racquetball and squash courts, sauna, staff offices, and meeting rooms; expanded weight training and cardio spaces; a group exercise room; Americans with Disabilities Act-accessible locker rooms; a gender-inclusive locker room and restroom; and a resurfaced running track that removes the banked turns. The project scope will also address heating, ventilation, and air conditioning systems; replace the electrical substation and boilers; update the fire detection and alarm system; install fire suppression; replace lighting and pool equipment; reconfigure the main building entrance to improve functionality and visibility; and construct a small canopy addition.