Beginning Tuesday, May 27 and lasting until Friday, June 27 (weather permitting), Fuller Road will be under construction for pavement resurfacing between the bridge over the railroad just west of Maiden Lane and the bridge over the Huron River just west of Cedar Bend Drive and U-M parking lot M75.  Small sections of Maiden Lane and East Medical Center Drive will also be resurfaced near the Fuller Road-Maiden Lane intersection.  During most of the project traffic on Fuller Road will be reduced to one lane in each direction.  On Maiden Lane, there will be intermittent closures of the curb lanes to allow for sidewalk ramp replacement.  Toward the end of the project, there will be two separate days of paving during which flaggers will redirect traffic around newly placed asphalt; this will be a moving operation and will cause traffic delays. Once known, the exact dates of the paving days will be shared.  Pedestrian traffic will be maintained on at least one side of the street at all times during the project.  For more information on City of Ann Arbor street closures, please visit http://www.a2gov.org/Alerts/Pages/EventRoadClosuresandDetours.aspx.  Specific questions about this project can be directed to Elizabeth Rolla, Senior Project Manager at the City of Ann Arbor: (734) 794-6410 ext.43636.

Skip to content