BEYSTER BOB AND BETTY BUILDING (1005092) |
College of Engineering Computer Science and Engineering Building
|
CENTRAL POWER PLANT (1000260) |
Central Power Plant 480 Volt Station Power System Upgrade, South Side
|
Central Power Plant Replace Steam Pressure Reducing Valves
|
LITERATURE SCIENCE AND THE ARTS (1000150) |
Literature, Science and the Arts (LS&A) Building Renovation Project
|
LURIE ANN AND ROBERT H BIOMEDICAL ENGINEERING BLD (1000406) |
College of Engineering Advanced Technologies Laboratories Biomedical Engineering Project
|
MATTHAEI BOT GDNS UTILITY-BOILER (1000981) |
Matthaei Botanical Gardens Boilers and Water Heater Replacement
|
MEDICAL SCIENCE UNIT I (1000190) |
University of Michigan Medical School Medical Science Unit I Cyclotron Relocation/Addition Project
|
NORTH CAMPUS CHILLER PLANT (1005139) |
North Campus Chiller Plant Project (NCCP)
|
TRAVERWOOD II (1005143) |
University of Michigan Hospitals and Health Centers (UMHHC) Relocation of Clinical Labs Project - Traverwood II Leasehold Improvements
|
UNIVERSITY HOSPITAL (1000316) |
University of Michigan Hospitals and Health Centers (UMHHC) University Hospital Neuro Angio BiPlane Imaging Equipment Replacement Project
|
University of Michigan Hospitals and Health Centers (UMHHC) University Hospital Procedures Recovery Expansion Project
|