This project will replace the switchgear components with an integrated ring system utilizing the latest technology, increasing reliability and system safety and improving worker safety. A power preservation system will benefit critical hospital and research operations with the capability to maintain generated electric and steam supply during a disruption or loss of external utility provided electricity.