Central Power Plant 13,200 Volt Switchgear Upgrade

Central Power Plant 13,200 Volt Switchgear Upgrade

This project will replace the switchgear components with an integrated ring system utilizing the latest technology, increasing reliability and system safety and improving worker safety. A power preservation system will benefit critical hospital and research operations with the capability to maintain generated electric and steam supply during a disruption or loss of external utility provided electricity.

Skip to content