U-M Health Rogel Cancer Center Infrastructure Upgrades

U-M Health Rogel Cancer Center Infrastructure Upgrades

The Rogel Cancer Center was constructed in 1997 and most of the major mechanical and plumbing systems are original to the building. This project will refurbish eight air handlers and associated equipment, replace a backup air handler and replace booster pumps. The project also includes a renovation of approximately 9,800 gross square feet of the main entrance patient drop off canopy ceiling, replacement of the infrared heaters and the fire suppression system.

Skip to content