|
|
Last Update |
Previous Version |
Replaces Document |
|
4.1 Compatibility with Existing Conditions |
May 2014 |
December 1991 |
SID-C Compatibility with Existing Conditions |
|
4.2 Building Envelope |
August 2014 |
May 2014 |
SID-A Building Envelope |
|
4.3 Building Commissioning |
July 2016 |
April 2016 |
SID-G Commissioning |
|
|
4.3.1 Design Phase Commissioning |
November 2016 |
October 2012 |
|
|
|
4.3.2 MEP Design Management |
November 2016 |
October 2012 |
|
|
|
4.3.3 Full Construction-Phase Commissioning |
September 2018 |
July 2016 |
|
|
|
4.3.4 Reduced Scope Construction Phase |
June 2018 |
July 2016 |
|
|
|
4.3.5 Commissioning Plan Procedure |
June 2018 |
July 2016 |
|
|
|
4.3.6 General Commissioning Procedures |
September 2018 |
June 2018 |
|
|
4.4 Site/Civil |
|
|
|
|
|
4.4.1 Landscape |
December 2018 |
January 2017 |
SID-T Landscape Materials |
|
|
4.4.2 Site Furnishing Standards Manual |
July 2018 |
January 2011 |
|
|
|
4.4.3 Stormwater Best Management Practices Manual |
Removed January 2017 |
December 2010 |
|
|
|
4.4.4 Banners |
|
|
|
|
|
4.4.5 Site Signage |
February 2016 |
|
|
|
4.5 Regulated and Hazardous Materials |
July 2008 |
July 2006 |
SID-I Regulated and Hazardous Materials |
|
4.6 Utilities for University Buildings |
May 2020 |
November 2015 |
SID-J University Provided Utilities |
|
4.7 Building Access Control |
January 2021 |
March 2018 |
SID-Q Building Access Control |
|
4.8 Fall Protection on Rooftops |
August 2016 |
June 2010 |
SID-R Fall Protection on Rooftops |
|
4.9 Bird Collision Deterrence |
July 2019 |
|
|
|
|
|
|
|
|
|
|