| 4.1 Compatibility with Existing Conditions | May 2014 | December 1991 | SID-C Compatibility with Existing Conditions |
| 4.2 Building Envelope | May 2025 | August 2014 | SID-A Building Envelope |
| 4.3 Building Commissioning | July 2016 | April 2016 | SID-G Commissioning |
| 4.3.1 Design Phase Commissioning | November 2016 | October 2012 | |
| 4.3.2 MEP Design Management | November 2016 | October 2012 | |
| 4.3.3 Full Construction-Phase Commissioning | September 2018 | July 2016 | |
| 4.3.4 Reduced Scope Construction Phase | June 2018 | July 2016 | |
| 4.3.5 Commissioning Plan Procedure | June 2018 | July 2016 | |
| 4.3.6 General Commissioning Procedures | September 2018 | June 2018 | |
| 4.4 Site/Civil | | | |
| 4.4.1 Landscape | December 2018 | January 2017 | SID-T Landscape Materials |
| 4.4.2 Site Furnishing Standards Manual | July 2018 | January 2011 | |
| 4.4.3 Stormwater Best Management Practices Manual | Removed January 2017 | December 2010 | |
| 4.4.4 Banners | | | |
| 4.4.5 Site Signage | February 2016 | | |
| 4.5 Regulated and Hazardous Materials | July 2008 | July 2006 | SID-I Regulated and Hazardous Materials |
| 4.6 Utilities for University Buildings | February 2026 | May 2020 | SID-J University Provided Utilities |
| 4.7 Building Access Control | January 2021 | March 2018 | SID-Q Building Access Control |
| 4.8 Fall Protection on Rooftops | March 2025 | June 2010 | SID-R Fall Protection on Rooftops |
| 4.9 Bird Collision Deterrence | July 2023 | | |
| 4.10 Telecommunication Cabling System | November 2023 | | |
| 4.11 Radon Mitigation | May 2025 | | |