Notes | Last Update | ||||
Notes – Civil Standard | July 2019 | MS Word | |||
Notes – SESC And EHS | July 2019 | MS Word | |||
Concrete Curb Details | |||||
18″ Curb & Gutter (U Of M Standard) | January 2017 | Microstation | AutoCad | ||
18″ Curb & Gutter, Spillout | January 2017 | Microstation | AutoCad | ||
18″ Gutter Pan | January 2017 | Microstation | AutoCad | ||
City Of Ann Arbor Curb & Gutter | January 2017 | Microstation | AutoCad | ||
Mountable Curb & Gutter | January 2017 | Microstation | AutoCad | ||
Straight Curb | January 2017 | Microstation | AutoCad | ||
Fastener Strip Detail | January 2017 | Microstation | AutoCad | ||
Concrete Sidewalk Details | |||||
Standard Sidewalk Detail | January 2017 | Microstation | AutoCad | ||
Thickended Edge Walk Detail | January 2017 | Microstation | AutoCad | ||
Pavement Expansion Joint | January 2017 | Microstation | AutoCad | ||
Sidewalk Control Joint Layout | January 2017 | Microstation | AutoCad | ||
MDOT Sidewalk Ramp R028J | January 2018 | ||||
Landscape | |||||
New Seed Area | July 2018 | Microstation | AutoCad | ||
Sod Joint | July 2018 | Microstation | AutoCad | ||
Tree Planting | July 2018 | Microstation | AutoCad | ||
Evergreen Planting | July 2018 | Microstation | AutoCad | ||
Shrub Planting | July 2018 | Microstation | AutoCad | ||
Shrub Bed Planting | July 2018 | Microstation | AutoCad | ||
Aluminum Edging | July 2018 | Microstation | AutoCad | ||
Groundcover | July 2018 | Microstation | AutoCad | ||
Vine Planting | July 2018 | Microstation | AutoCad | ||
Bulb Planting | July 2018 | Microstation | AutoCad | ||
Miscellaneous Details | |||||
Bike Racks – Various Surfaces | January 2017 | Microstation | AutoCad | ||
Bicycle Hoops – Typical Layout | January 2017 | Microstation | AutoCad | ||
Concrete Wheel Stops | January 2017 | Microstation | AutoCad | ||
Bollard | January 2017 | Microstation | AutoCad | ||
Sign Mount Detail | January 2017 | Microstation | AutoCad | ||
Landscape Island Topsoil Detail | January 2017 | Microstation | AutoCad | ||
Frost Free Stoop | January 2017 | Microstation | AutoCad | ||
Road Utility Location Plan | January 2017 | Microstation | AutoCad | ||
City of Ann Arbor Utility Material Requirements (note that U-M material requirements meet or exceed City requirements) |
February 2020 | ||||
Pavement Details | |||||
Parking Lot Pavement | January 2017 | Microstation | AutoCad | ||
Road Pavement | January 2017 | Microstation | AutoCad | ||
Milled Edge | January 2017 | Microstation | AutoCad | ||
Bituminous Walk Path | January 2017 | Microstation | AutoCad | ||
Pervious Concrete Detail | January 2017 | Microstation | AutoCad | ||
Porous Concrete Detail | January 2017 | Microstation | AutoCad | ||
Paver Details | |||||
Paver – Permeable System On Porous Concrete | January 2017 | Microstation | AutoCad | ||
Precast Paver On Concrete Base | January 2017 | Microstation | AutoCad | ||
Sanitary Sewer Details | |||||
City of Ann Arbor Standard Details | November 2015 | ||||
Site Furnishings Details | |||||
Bench Specification | January 2017 | ||||
Chair Specifications | January 2017 | ||||
Memorial Bench Specifications | January 2017 | ||||
Table Specifications | January 2017 | ||||
Trash Recepticle Specifications | January 2017 | ||||
Soil Erosion Details | |||||
Inlet Filter Sack | January 2017 | Microstation | AutoCad | ||
Soil Erosion Blanket | January 2017 | Microstation | AutoCad | ||
Silt Fence | January 2017 | Microstation | AutoCad | ||
Rip-Rap Detail | January 2017 | Microstation | AutoCad | ||
Seeded Area | January 2017 | Microstation | AutoCad | ||
Anti-Tracking Pad Detail | January 2017 | Microstation | AutoCad | ||
Straw Wattle Detail | January 2017 | Microstation | AutoCad | ||
Trench Drain Filter Fabric | January 2017 | Microstation | AutoCad | ||
Stone Inlet Filter | January 2017 | Microstation | AutoCad | ||
Straw Bale | January 2017 | Removed June 2018 | |||
Storm Details | |||||
2′ Diameter Storm Inlet | January 2017 | Microstation | AutoCad | ||
4′ Diameter Precast Catch Basin | January 2017 | Microstation | AutoCad | ||
4′ Diameter Precast Storm Manhole | September 2017 | Microstation | AutoCad | ||
Double Storm Catch Basin | January 2017 | Microstation | AutoCad | ||
Underdrain | January 2017 | Microstation | AutoCad | ||
Underdrain With Curb & Gutter | January 2017 | Microstation | AutoCad | ||
MH Cover Adjustment And Structure Rebuild | January 2017 | Microstation | AutoCad | ||
Trench Details | |||||
Utility Trench With Asphalt Patch | January 2017 | Microstation | AutoCad | ||
Utility Trench With Concrete Patch | January 2017 | Microstation | AutoCad | ||
Utility Trench Gravel Patch | January 2017 | Microstation | AutoCad | ||
Utility Trench Green Belt | January 2017 | Microstation | AutoCad | ||
Wall Details | |||||
Typical 30″ To 56″ Retaining Wall Detail | January 2017 | Microstation | AutoCad | ||
Typical Concrete Seatwall | January 2017 | Microstation | AutoCad | ||
Typical Wall Jointing & Corners | January 2017 | Microstation | AutoCad | ||
Water Main Details | |||||
City of Ann Arbor Water Main Standard Details | November 2015 |
MENU