Notes
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Notes – Civil Standard | October 2024 | |||
Notes – SESC And EHS | July 2019 | MS Word |
Concrete Curb Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Curb & Gutter Details Composite | December 2023 | Microstation | AutoCad | |
18″ Gutter Pan | January 2017 | Microstation | AutoCad | |
Straight Curb | January 2017 | Microstation | AutoCad | |
Fastener Strip Detail | January 2017 | Microstation | AutoCad |
Concrete Sidewalk Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Standard Sidewalk Detail | January 2017 | Microstation | AutoCad | |
Thickended Edge Walk Detail | January 2017 | Microstation | AutoCad | |
Pavement Expansion Joint | January 2017 | Microstation | AutoCad | |
Sidewalk Control Joint Layout | January 2017 | Microstation | AutoCad | |
MDOT Sidewalk Ramp R028J | January 2018 |
Landscape
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
New Seed Area | July 2018 | Microstation | AutoCad | |
Sod Joint | July 2018 | Microstation | AutoCad | |
Tree Planting | July 2018 | Microstation | AutoCad | |
Evergreen Planting | July 2018 | Microstation | AutoCad | |
Shrub Planting | July 2018 | Microstation | AutoCad | |
Shrub Bed Planting | July 2018 | Microstation | AutoCad | |
Aluminum Edging | July 2018 | Microstation | AutoCad | |
Groundcover | July 2018 | Microstation | AutoCad | |
Vine Planting | July 2018 | Microstation | AutoCad | |
Bulb Planting | July 2018 | Microstation | AutoCad |
Miscellaneous Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Bike Racks – Various Surfaces | October 2022 | Microstation | AutoCad | |
Bicycle Hoops – Typical Layout | January 2017 | Microstation | AutoCad | |
Concrete Wheel Stops | January 2017 | Microstation | AutoCad | |
Bollard | January 2017 | Microstation | AutoCad | |
Sign Mount Detail | January 2017 | Microstation | AutoCad | |
Landscape Island Topsoil Detail | January 2017 | Microstation | AutoCad | |
Frost Free Stoop | January 2017 | Microstation | AutoCad | |
Road Utility Location Plan | January 2017 | Microstation | AutoCad | |
City of Ann Arbor Utility Material Requirements (note that U-M material requirements meet or exceed City requirements) |
February 2020 |
Pavement Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Parking Lot Pavement | January 2017 | Microstation | AutoCad | |
Road Pavement | January 2017 | Microstation | AutoCad | |
Milled Edge | January 2017 | Microstation | AutoCad | |
Bituminous Walk Path | January 2017 | Microstation | AutoCad | |
Pervious Concrete Detail | January 2017 | Microstation | AutoCad | |
Porous Concrete Detail | January 2017 | Microstation | AutoCad |
Paver Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Paver – Permeable System On Porous Concrete | January 2017 | Microstation | AutoCad | |
Precast Paver On Concrete Base | January 2017 | Microstation | AutoCad |
Sanitary Sewer Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
City of Ann Arbor Standard Details | March 2024 |
Site Furnishings Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Bench Specification | January 2017 | |||
Chair Specifications | January 2017 | |||
Memorial Bench Specifications | January 2017 | |||
Table Specifications | January 2017 | |||
Trash Recepticle Specifications | January 2017 |
Soil Erosion Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Inlet Filter Sack | January 2017 | Microstation | AutoCad | |
Soil Erosion Blanket | January 2017 | Microstation | AutoCad | |
Silt Fence | January 2017 | Microstation | AutoCad | |
Rip-Rap Detail | January 2017 | Microstation | AutoCad | |
Seeded Area | January 2017 | Microstation | AutoCad | |
Anti-Tracking Pad Detail | January 2017 | Microstation | AutoCad | |
Straw Wattle Detail | January 2017 | Microstation | AutoCad | |
Trench Drain Filter Fabric | January 2017 | Microstation | AutoCad | |
Stone Inlet Filter | January 2017 | Microstation | AutoCad | |
Straw Bale | January 2017 | Removed June 2018 |
Storm Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
2′ Diameter Storm Inlet | January 2017 | Microstation | AutoCad | |
4′ Diameter Precast Catch Basin | January 2017 | Microstation | AutoCad | |
4′ Diameter Precast Storm Manhole | September 2017 | Microstation | AutoCad | |
Double Storm Catch Basin | January 2017 | Microstation | AutoCad | |
Underdrain | January 2017 | Microstation | AutoCad | |
Underdrain With Curb & Gutter | January 2017 | Microstation | AutoCad | |
MH Cover Adjustment And Structure Rebuild | January 2017 | Microstation | AutoCad |
Trench Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Utility Trench With Asphalt Patch | January 2017 | Microstation | AutoCad | |
Utility Trench With Concrete Patch | January 2017 | Microstation | AutoCad | |
Utility Trench Gravel Patch | January 2017 | Microstation | AutoCad | |
Utility Trench Green Belt | January 2017 | Microstation | AutoCad |
Wall Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
Typical 30″ To 56″ Retaining Wall Detail | January 2017 | Microstation | AutoCad | |
Typical Concrete Seatwall | January 2017 | Microstation | AutoCad | |
Typical Wall Jointing & Corners | January 2017 | Microstation | AutoCad |
Water Main Details
Guideline | Last Updated | Microstation | AutoCAD | |
---|---|---|---|---|
City of Ann Arbor Water Main Standard Details | November 2015 |